Beginning 3/31, the contractor will set up traffic control for pre-stage configurations related to the intersection improvements at IL Route 59 and 143rd Street.
Summary of Pre-Stage Traffic Control and Construction Activity
IL Route 59
- Traffic will be shifted slightly to the outside lanes each direction
- The median will be reconstructed
- Estimated Duration: 3 Weeks (Weather Permitting)
Motorists can expect longer than average travel times through the work zone. Please be on the lookout for workers and equipment. Trucks may be entering and exiting the area, so exercise caution and reduce your speed.